Successful overhaul of CAPSTONE C200 microturbine

In accordance with the terms of a recently concluded service contract with our client WEPPLER FILTER, we performed the planned overhaul of a CAPSTONE C200 turbine with an electrical output of 200 kW. The turbine is located on the premises of WEPPLER FILTER (https://wepplerczech.cz/en/).

The overhaul was provided within the contractual terms of the CAPSTONE "Factory Protection Plan" (FPP). The FPP ensures that our clients are provided with service and deliveries of spare parts, for all scheduled and unscheduled repairs, at a pre-agreed price.

18.05.2022